Assisting Hurlock with Structure Fire
 
August 26, 2021
 

Around 2:09 station 26 was dispatched to assist Hurlock with a working structure fire. Chief 1-2 from Cambridge was first to arrive and confirmed working fire from a 2- story house with fire showing. Engine-tanker 26 made a response with crew of 5 to assist. Sta 26 cleared 16:16.

 
Mutual Aid: 21,16,1,26,(200,100 Caroline), (14,9 Wicomico), Sussex 87, Paramedic 600